Washington City: Development

Untitled Document

Building Division

Building Inspections and Permits.

The Building Division of the Community Development Department currently consists of a Chief Building Official, three Building Inspectors, and a Building Permit Technician.

When Applying for a building permit, the following items must be submitted:

*one CD (digital copy) and 2 complete building plans with the engineer wet stamp on them.

**SITE PLANS need to be submitted with the building plans and include the following location information:

  1. Power Transformers
  2. Power Pedestals
  3. Phone Pedestals
  4. Cable Television
  5. Sewer Lateral Lines
  6. Water Meter
  7. Fire Hydrant
  8. Width of the curb cut you are proposing

Wall anchorage requirements have been revised as follows. In 6st line change "3/16in X 2in X 2in" to "1/4in X 3in X 3in"

Please be aware that roof nailing inspections are now being required. Safe ladders are to be made available by the contractor.

Also termite certificates will need to be submitted for your final certificate of occupancy along with the other required certificates.

The design criteria for buildings and structures are subject to the following adopted codes and standards, these standards can be purchased from ICC:

  • 2009 International Building Code (IBC)
  • 2009 International Residential Code (IRC)
  • 2009 International Energy Conservation Code (IECC)
  • 2008 National Electrical Code (NEC)
  • 2009 International Plumbing Code (IPC)
  • 2009 International Mechanical Code (IMC)
  • 2009 Uniform Code for the Abatement of Dangerous Buildings
  • 2009 Edition of the Uniform Code for Building Conservation
  • Ground Snow Load - 21 lbs
  • Wind Speed - 90 mph
  • Seismic design Category - D1
  • Frost Line - 6" depth
  • Termite Rating - Moderate to Heavy Infestation

 

Inspections are required for each level of construction, contact the Building Division at 656-6326 to obtain current levels and to schedule an inspection when a particular level of construction will be ready for inspection, if you receive the voicemail please leave a message. When calling please leave your name, call back number, building permit number, property address where construction is taking place, and the type of inspection being requested. The Building Inspectors try to perform the requested inspections within 48 hours but the timing depends on the current workload and the number of available inspectors.

Washington City Building Division has partnered with:

BluePrince link




 

 


Houses and other structures are going up quickly in Washington City.

Quick Apps:

Questions & Answers
Council Live
City Map
City Codes
Staff Directory
Home » Development » CommunityDevelopment » Building